Archives
Projects
Discipline Used: Design
Nur Pon Open Space Side Channel Salmon Habitat Project
This project, located downstream of the Shasta Dam and nestled in the north end of the Sacramento Valley, restored 4.8 acres of critical salmonid spawning and rearing habitat in Redding’s._.
Flights End Restoration Concept Modeling and Alternative Analysis
The Flights End site is within the ODFW managed Sauvie Island Wildlife Area, a floodplain refuge habitat just downstream of the urban waterfront corridors on the Columbia and Willamette Rivers.
Crane/Domeyer/Willow Bar Restoration Project
The Crane, Domeyer, and Willow Bar sites are all part of the Sauvie Island Wildlife Area (Oregon Department of Fish & Wildlife). They are managed for fish and wildlife habitat._.
Lower Yuba River Long Bar Restoration Project
cbec is working as part of a team on this floodplain restoration project aiming to create rearing habitat for salmonids on a roughly 50-acre riverside gravel mine property at Long._.
Calero County Park Pond and Wetland Restoration and Monitoring Project
Funded by the Santa Clara Valley Habitat Agency, this project was planned, designed, and constructed to restore pond and wetland habitats at two locations in Calero County Park.
Bear River Levee Setback Project
Prior to joining cbec, select cbec staff members provided geomorphic and ecosystem enhancement services to the Three Rivers Levee Improvement Authority (TRLIA) on the Bear River Levee Setback Project.
Lower American River Salmonid Habitat Enhancement Program
This ongoing salmonid gravel augmentation and side-channel habitat establishment program effort is made possible by continued collaboration with the Water Forum, US Bureau of Reclamation, and the US Fish &._.
Butano Creek Channel Reconnection and Resilience Project
This multi-objective project addresses critical fish passage, water quality and flood risk challenges affecting Butano Creek, Pescadero Marsh and Lagoon and the surrounding community of Pescadero in unincorporated San Mateo._.
Wetland Design in the Patoka Valley
cbec prepared final designs for wetland creation and enhancement on two 40-acre parcels of land in Pike County owned by Patoka Valley Conservation Partners (PVCP). This project was ultimately enrolled._.
Metz Lateral Channel Rehabilitation
Located in Posey County, Indiana, the purpose of this project was to stabilize ongoing erosion problems in the lower 750 feet of the Metz Lateral Drain upstream from its confluence._.
Wallace Weir Improvement and Fish Exclusion Project
Part of the California Natural Resources Agency’s California EcoRestore initiative, this fish exclusion project aimed to improve the operations of Wallace Weir, as well as implement a fish trapping facility._.
Little Egbert Tract Feasibility Study and Multi-Benefit Project
Under contract with SAFCA, the study team (Wood Rogers, cbec, MBK, ICF, and David Sill) in collaboration with the steering committee (SAFCA, Larsen Wurzel & Associates, Westervelt Ecological Services, DWR._.
Laguna Creek Restoration Project
Vulcan Materials Company is actively mining aggregate at the Triangle Rock Products facility in Sacramento County adjacent to Laguna Creek and within the creeks active floodplain. To mitigate for impacts._.
Develop Solutions to Enhance Habitat and Reduce Flooding Along Butano Creek
A cbec-Stillwater Sciences team was contracted to develop solutions to enhance in channel and off channel habitat while also reducing the frequent flooding of Pescadero Creek Road at Butano Creek.._.
Caltrans HSU Guidance Document
Trash and road debris clogging storm drains is a major problem within California’s municipalities. This phenomenon affects numerous systems that rely on the effective filtering of stormwater, as well as._.