Archives
Projects
Discipline Used: Design
Allt Lorgy Restoration
cbec applied a full ‘process restoration’ strategy on a tributary of the River Dulnain, with the aim of reinstating dynamic geomorphic and ecological processes. We identified the dominant constraints to._.
Southport Multi-Objective Flood Control and Habitat Restoration Project
A cornerstone project for cbec, spanning multiple years, and with various project team configurations, this West Sacramento Area Flood Control Agency (WSAFCA) project’s goal is to set back parts of._.
Swift Slough Restoration Feasibility Study
cbec conducted a feasibility study, on behalf of Florida Fish and Wildlife Conservation Commission, to investigate the dynamics of sediment transport / deposition in the main channel of the Apalachicola._.
Yolo Bypass Wildlife Area Habitat and Drainage Improvements
The Yolo Bypass Wildlife Area (YBWA) supports agricultural and wildlife habitat management objectives as well as public use. Water delivery and drainage are vital to provide optimal conditions for all._.
Boulder Creek Stabilization Project
cbec eco engineering (cbec) developed design plans for stream bed repairs associated with Boulder Creek, downstream of the Lawson Portal, along the toe of the Boulder Creek Landslide. Channel incision._.
Yolo Flyway Farms Tidal Restoration Project
Diagram of project area. Excavation of south berm breach. Excavation of north berm breach. The Yolo Flyway Farms Tidal Restoration Project is located at the southern end of the Yolo._.
Lower American River, Lake Natoma and Folsom Reservoir Hydrodynamic and Water Temperature Modeling Project
cbec has developed and applied a variety of hydrodynamic and water temperature models for the American River, Lake Natoma and Folsom Reservoir.
Black Butte Dam Erosion Repairs
The City of Santa Clara operates a hydroelectric power generating facility at Black Butte Reservoir near Orland, CA. When the facility was constructed, a re-regulation basin was created below the._.
Oak Ridge Drive Bridge Replacement Geomorphology Study
Linda Creek, a tributary to Dry Creek, runs through a greenway corridor within a densely urbanized watershed. This effort combined field reconnaissance with 2D modeling to investigate the effects of._.
Decker Island Habitat Restoration Project
cbec performed site‐scale hydrodynamic modeling to evaluate restoration design alternatives at Decker Island in support of the DWR Decker Island Habitat Restoration Project.
Hallwood Channel and Floodplain Restoration Project
This project is designed to restore and enhance ecosystem processes within an important reach of the Yuba River. The primary project focus is on enhancing productive juvenile salmonid rearing habitat._.
Yolo County Drainage and Water Infrastructure Improvement Study
Wallace Weir is located at the terminus of the Knights Landing Ridge Cut and west levee of the Yolo Bypass. Yolo County funded the study of proposals to address potential._.
Honolulu Bar Fisheries Enhancement Project
Honolulu Bar is located on United States Army Corps of Engineers (USACE) property and funded by a grant from the U.S. Fish and Wildlife Service – Anadromous Fish Restoration Program.._.
Sun Creek Hydromodification Planning
The Sun Creek development is a 1,250 acre proposed development within the City limits of Rancho Cordova. Mackay & Somps is the civil engineering consultant responsible for the master plan._.
Sewer Crossing Bank Stabilization and Toe Stabilization Design
As part of the Sacramento Area Sewer District’s Creek Protection Project, cbec teamed with Brown & Caldwell to conduct a geomorphic reconnaissance at 40 stream sewer crossings in Sacramento County.._.