Calero County Park Pond and Wetland Restoration Project
Funded by the Santa Clara Valley Habitat Agency, this project was planned, designed, and constructed to restore pond and wetland habitats at two locations in Calero County Park.

Bear River Levee Setback Project
Prior to joining cbec, select cbec staff members provided geomorphic and ecosystem enhancement services to the Three Rivers Levee Improvement Authority (TRLIA) on the Bear River Levee Setback Project.

Lower American River Salmonid Gravel Augmentation and Side-Channel Habitat Establishment Program
This ongoing salmonid gravel augmentation and side-channel habitat establishment program effort is made possible by continued collaboration with the Water Forum, US Bureau of Reclamation, and the US Fish &._.

Butano Creek Channel Reconnection and Resilience Project
This multi-objective project addresses critical fish passage, water quality and flood risk challenges affecting Butano Creek, Pescadero Marsh and Lagoon and the surrounding community of Pescadero in unincorporated San Mateo._.

Wetland Design in the Patoka Valley
cbec prepared final designs for wetland creation and enhancement on two 40-acre parcels of land in Pike County owned by Patoka Valley Conservation Partners (PVCP). This project was ultimately enrolled._.

Metz Lateral Channel Rehabilitation
Located in Posey County, Indiana, the purpose of this project was to stabilize ongoing erosion problems in the lower 750 feet of the Metz Lateral Drain upstream from its confluence._.

Natomas East Main Drainage Canal Monitoring Project
cbec has been undertaking a variety of different monitoring activities on Natomas East Main Drainage Canal (NEMDC), otherwise known as Steelhead Creek, since 2015. Monitoring activities include unmanned aerial system._.

Laguna Creek Restoration Project
Vulcan Materials Company is actively mining aggregate at the Triangle Rock Products facility in Sacramento County adjacent to Laguna Creek and within the creeks active floodplain. To mitigate for impacts._.

Develop Solutions to Enhance Habitat and Reduce Flooding Along Butano Creek
A cbec-Stillwater Sciences team was contracted to develop solutions to enhance in channel and off channel habitat while also reducing the frequent flooding of Pescadero Creek Road at Butano Creek.._.

Dry Creek Greenway Trail Fluvial Audit
cbec was contracted to assess the potential risk and prioritize mitigative measures for the City of Roseville muti-use trail along approximately 4.5 miles of Dry, Cirby and Linda Creeks between._.

Bangor P990 Wharf Impacts Modeling
cbec performed detailed 2-dimensional hydrodynamic and sediment transport modeling of tidal flux and currents in the Hood Canal, a sub-basin within the Puget Sound inlet system, Washington.

Selby Slag EIR
On behalf of the California Department of Toxic Substances Control (DTSC), cbec worked as a subcontractor to Ascent Environmental, Inc., and teamed with AECOM and Stillwater Sciences to inform the._.

Dry Creek Watershed Project Prioritization
cbec identified, reviewed and prioritized stream enhancement and rehabilitation projects within the City’s portion of the Dry Creek watershed.

Bangor P990 Shine Tidelands State Park Tidal Lagoon Restoration Feasibility and Tidal Hydrodynamic Modeling
cbec performed detailed field data collection, and developed a 2-dimensional hydrodynamic model of tidal and nearshore processes at the Shine Tidelands State Park proposed restoration site.

Bangor P990 Big Quilcene River Floodplain and Delta Restoration Feasibility, Fluvial and Tidal Hydrodynamic Modeling
cbec performed detailed field data collection, and 2-dimensional hydrodynamic modeling of the complex fluvial and tidal deltaic reaches of the Big Quilcene River proposed restoration site, Jefferson County, Washington.