Archives
Projects
Discipline Used: Field Services

Yolo Bypass Wildlife Area Habitat and Drainage Improvements
Undersized drainage infrastructure. Aerial site map displaying 5 project locations Habitat and agriculture. The Yolo Bypass Wildlife Area (YBWA) is supports agricultural and wildlife habitat management objectives as well as._.

Boulder Creek Stabilization Project
cbec eco engineering (cbec) developed design plans for stream bed repairs associated with Boulder Creek, downstream of the Lawson Portal, along the toe of the Boulder Creek Landslide. Channel incision._.

Lower American River, Lake Natoma and Folsom Reservoir Hydrodynamic and Water Temperature Modeling Project
cbec has developed and applied a variety of hydrodynamic and water temperature models for the American River, Lake Natoma and Folsom Reservoir.

WSAFCA Flood Program Phase 1
cbec provided geomorphic assessment and planning services to support preparation of an updated flood program scope and budget for WSAFCA The updated scope and budget for the program were presented._.

Lower Yuba River Hallwood Channel and Floodplain Restoration Project
The Project (also referred to previously as “Daguerre Alley”) is designed to restore and enhance ecosystem processes with a primary focus on enhancing productive juvenile salmonid rearing habitat to increase._.

Sun Creek Hydromodification Planning
The Sun Creek development is a 1,250 acre proposed development within the City limits of Rancho Cordova. Mackay & Somps is the civil engineering consultant responsible for the master plan._.

Honolulu Bar Fisheries Enhancement Project
Honolulu Bar is located on United States Army Corps of Engineers (USACE) property and funded by a grant from the U.S. Fish and Wildlife Service – Anadromous Fish Restoration Program.._.

Sewer Crossing Bank Stabilization and Toe Stabilization Design
As part of the Sacramento Area Sewer District’s Creek Protection Project, cbec teamed with Brown & Caldwell to conduct a geomorphic reconnaissance at 40 stream sewer crossings in Sacramento County.._.

Cordova Hills Geomorphic and Hydromodification Assessment
Panoramic view over Cordova Hills. Incised creek channel. cbec assisted SBM Site Services, LLC and MacKay & Somps Civil Engineers with the stormwater drainage master planning for the Cordova Hills._.

Bangor P990 Crescent Bay Tidal Inlet Monitoring
In 2010, the US Navy undertook a tidal wetland restoration project at Crescent Harbor, Whidbey Island, Puget Sound, Washington. An important element of the restoration project was to breach a._.

McKay’s Point Reservoir Sedimentation Rate Study
Bathymetric Surface Comparison (2000 to 2011) Bathymetric Data Collection Using RTK cbec was contracted by NCPA to perform a Sedimentation Rate Study at McKay’s Point Reservoir. cbec performed a bathymetric._.

Santa Ynez River Two-Dimensional Flow Model
Santa Ynez River Simulated velocity for a flow of 6,150 cfs Water surface elevation for a flow of 1,300 cfs cbec was contracted by NMFS to construct a two-dimensional hydrodynamic._.

Lower Squaw Creek Restoration Project
A straightened and over-sized reach of the stream channel, with the ski resort in the background Examples of existing grade control and bank hardening currently in place This project intends._.

Fluvial Geomorphic Assessment in Support of 100-Year Flood Risk Analysis of the Yuba Goldfields
cbec performed a geomorphic assessment of the lower Yuba River adjacent to the Yuba Goldfields. The focus of the effort was to assess the historic rates, and predict future rates,._.

Water Quality Evaluation of Battle Bend and Other Major Apalachicola River Sloughs
cbec worked with Philip Williams and Associates on a project that aimed to characterize the hydraulic connectivity and water quality of large floodplain sloughs within the Apalachicola River System. This._.