Discipline Used: Hydraulics

Calero County Park Pond and Wetland Restoration Project
Funded by the Santa Clara Valley Habitat Agency, this project was planned, designed, and constructed to restore pond and wetland habitats at two locations in Calero County Park.

Bear River Levee Setback Project
Prior to joining cbec, select cbec staff members provided geomorphic and ecosystem enhancement services to the Three Rivers Levee Improvement Authority (TRLIA) on the Bear River Levee Setback Project.

Lower American River Salmonid Gravel Augmentation and Side-Channel Habitat Establishment Program
This ongoing salmonid gravel augmentation and side-channel habitat establishment program effort is made possible by continued collaboration with the Water Forum, US Bureau of Reclamation, and the US Fish &._.

Butano Creek Channel Reconnection and Resilience Project
This multi-objective project addresses critical fish passage, water quality and flood risk challenges affecting Butano Creek, Pescadero Marsh and Lagoon and the surrounding community of Pescadero in unincorporated San Mateo._.

San Joaquin River Tributaries Settlement Process Technical Support
Example height above river mapping for the Tuolumne River and identification of two potential floodplain restoration sites. cbec provided technical support to the San Joaquin Technical Group by conducting data._.

Kings Bay Flow Modeling and Sedimentation Study
cbec worked as a subcontractor to Versar, Inc, on behalf of AECOM and Naval Facilities Engineering Command (NAVFAC) – Atlantic. cbec built a hydrodynamic and sediment transport model of the._.

Metz Lateral Channel Rehabilitation
Located in Posey County, Indiana, the purpose of this project was to stabilize ongoing erosion problems in the lower 750 feet of the Metz Lateral Drain upstream from its confluence._.

Flood Impact Analysis for the Saluda Hydroelectric Project
The Federal Energy Regulatory Commission (FERC) requested Dominion Energy to quantify potential effects of a proposed change in reservoir operational procedures on flood levels upstream and downstream from the Saluda Hydroelectric._.

Wallace Weir Improvement and Fish Exclusion Project
Part of the California Natural Resources Agency’s California EcoRestore initiative, this fish exclusion project aimed to improve the operations of Wallace Weir, as well as implement a fish trapping facility._.

Little Egbert Multi-Objective Project and Feasibility Study
Under contract with SAFCA, the study team (Wood Rogers, cbec, MBK, ICF, and David Sill) in collaboration with the steering committee (SAFCA, Larsen Wurzel & Associates, Westervelt Ecological Services, DWR._.

Laguna Creek Restoration Project
Vulcan Materials Company is actively mining aggregate at the Triangle Rock Products facility in Sacramento County adjacent to Laguna Creek and within the creeks active floodplain. To mitigate for impacts._.

Develop Solutions to Enhance Habitat and Reduce Flooding Along Butano Creek
A cbec-Stillwater Sciences team was contracted to develop solutions to enhance in channel and off channel habitat while also reducing the frequent flooding of Pescadero Creek Road at Butano Creek.._.

Bangor P990 Wharf Impacts Modeling
cbec performed detailed 2-dimensional hydrodynamic and sediment transport modeling of tidal flux and currents in the Hood Canal, a sub-basin within the Puget Sound inlet system, Washington.

Selby Slag EIR
On behalf of the California Department of Toxic Substances Control (DTSC), cbec worked as a subcontractor to Ascent Environmental, Inc., and teamed with AECOM and Stillwater Sciences to inform the._.

Bangor P990 Shine Tidelands State Park Tidal Lagoon Restoration Feasibility and Tidal Hydrodynamic Modeling
cbec performed detailed field data collection, and developed a 2-dimensional hydrodynamic model of tidal and nearshore processes at the Shine Tidelands State Park proposed restoration site.