Bangor P990 Big Quilcene River Floodplain and Delta Restoration Feasibility, Fluvial and Tidal Hydrodynamic Modeling
cbec performed detailed field data collection, and 2-dimensional hydrodynamic modeling of the complex fluvial and tidal deltaic reaches of the Big Quilcene River proposed restoration site, Jefferson County, Washington.

Bangor P990 Big Beef Estuary Restoration Feasibility, Tidal Hydrodynamic and Sediment Transport Modeling
cbec performed detailed field data collection, and 2-dimensional hydrodynamic and sediment transport modeling of estuarine processes at the Big Beef Creek and Estuary proposed restoration site.

Huckleberry Island Dam Modification
cbec was contracted to investigate the feasibility of modifying or removing the Huckleberry Island Dam to improve passage conditions. Huckleberry Island Dam is located on the San Lorenzo River in._.

Lower American River Current Condition DEM and 2D Model Development Project
cbec is developing a current conditions digital elevation model (DEM) and HEC-RAS two-dimensional (2D) hydrodynamic model of the lower American River for the Sacramento Water Forum and the Sacramento Area._.

Hallingdalselva Habitat Enhancement
In 2014, cbec was contracted by E-CO to undertake an options appraisal on a ~ 7 km reach of the River Hallingdalselva, nr. Gol, Norway.

Dowlais Culvert Assessment
cbec undertook work relating to the design of a culvert on the Nant Morlais stream in Dowlais, Merthyr Tydfil. An upgraded access track suitable for the transport of construction machinery._.

SEPA Pilot Catchment Project – Options Appraisal and Outline Design – River Nith (Castlemains, New Cumnock)
cbec have developed detailed restoration designs for a reach of the River Nith at Castlemains, New Cumnock. This reach was prioritised for restoration in the first phase of SEPA’s pilot._.
Eddleston Water Restoration at Cringletie, Lake Wood and Shiphorns
cbec was contracted by Dundee University and the Tweed Forum to provide the joint benefits of improving the ecological status (through river restoration) and natural flood management to local housing/._.

East Tullos Burn Restoration
cbec was contracted by Aberdeen City Council to restore the East Tullos Burn in Torry from a hard‐engineered straightened channel into a more natural stream and associated functional floodplain. An._.

Southport Multi-Objective Flood Control and Habitat Restoration Project
A cornerstone project for cbec, spanning multiple years, and with various project team configurations, this West Sacramento Area Flood Control Agency (WSAFCA) project’s goal is to set back parts of._.

Oroville Wildlife Area Flood Stage Reduction Project
Feather River bank composition Bank line analysis cbec was sub contracted by PBI to provide a geomorphic assessment of the Feather River in vicinity of the South Unit Oroville Wildlife._.

Swift Slough Restoration Feasibility Study
cbec conducted a feasibility study, on behalf of Florida Fish and Wildlife Conservation Commission, to investigate the dynamics of sediment transport / deposition in the main channel of the Apalachicola._.

Yolo Bypass Wildlife Area Habitat and Drainage Improvements
Undersized drainage infrastructure. Aerial site map displaying 5 project locations Habitat and agriculture. The Yolo Bypass Wildlife Area (YBWA) is supports agricultural and wildlife habitat management objectives as well as._.

Lower American River, Lake Natoma and Folsom Reservoir Hydrodynamic and Water Temperature Modeling Project
cbec has developed and applied a variety of hydrodynamic and water temperature models for the American River, Lake Natoma and Folsom Reservoir.

Black Butte Dam Erosion Repairs
The City of Santa Clara operates a hydroelectric power generating facility at Black Butte Reservoir near Orland, CA. When the facility was constructed, a re-regulation basin was created below the._.