Discipline Used: Hydraulics

Hardpan Vernal Pool Hydrology
2010 NAIP air photo of Highway 149/70 Mitigation site Field Measurements at Orchard 80 Preserve While working at the University of Idaho, Boise – Center for Ecohydraulics, Mr. Campbell was._.

Santa Clara River Estuary Habitat Restoration and Enhancement Feasibility Study
This project aims to explore the feasibility of expanding and enhancing estuarine habitat for steelhead and other native and protected species within the McGrath State Beach Campground. The Santa Clara._.

Coon Creek Watershed Assessment
Survey reach characterized by fluvial audit Specific Stream Power analysis from the geomorphic assessment cbec and H.T. Harvey and Associates (HTH) are performing a multi-disciplinary assessment of the Coon Creek._.

Prospect Island Tidal Restoration Project
Tules surrounding a tidal channel in the Cache Slough Complex Snapshot of model mesh and bathymetry The Cache Slough Complex is located within the Legal Delta, California. cbec previously developed._.

Sacramento River East Levee Erosion Repair Design Assistance
Erosion Repair Site Survey in Sacramento River Erosion Repair Site Survey Transect The Sacramento Flood control Agency (SAFCA) is undertaking a project to repair nine erosion sites on the Sacramento._.

Donner Basin Watershed Assessment
Erosion Hazard Analysis Floodplain and channel restoration concept graphic for creek confluence cbec, joined by HTH and Susan Lindstrom (consulting archeologist), is conducting a watershed assessment of the Donner Basin,._.

Butano Creek Floodplain Reconnection and Restoration Design and Monitoring
Engineered log jam in channel supports floodplain reconnection on left bank where berm was removed. Simulated floodplain inundation for a 2-year event for pre-project and post-project conditions. cbec developed designs,._.

Lower American River – Temperature Refugia, Temperature Monitoring, and On-Call Support
Trimaran setup for temperature mapping Example of temperature mapping cbec has provided temperature and stage monitoring on the Lower American River (LAR) since 2008. In continued support of this effort,._.

Fremont Weir Alternative 5
10% Grading Plans 10% HEC-RAS Modeling As part of the DWR/USBR Yolo Bypass Salmonid Habitat Restoration and Fish Passage Project EIS/EIR to identify and evaluate alternatives to address fish passage._.

American River Parkway Cordova Creek Naturalization
cbec provided restoration/rehabilitation design services for Cordova Creek. Our approach to habitat restoration design and planning included three co-equal goals of the project: habitat quality, aesthetics, and functionality. Multiple stakeholders._.

M&T Chico Ranch / Llano Seco Rancho Fish Screen Facility Long-Term Project – Evaluation of Rock Removal on the Sacramento River
Meander migration model results SRH 2D model output – Velocity and Magnitude for the 100-year event M&T/Llano Seco Pumping Plant and Fish Screen Facility (Facility) provides water to agricultural lands._.

Moosa Creek Mitigation Bank
Aerial map of watersheds and project areas Existing 100-year flow diagram cbec was recently contracted by Moosa Creek, LLC, who proposes to develop the Moosa Creek Mitigation and Conservation Bank._.

Dry Creek Habitat Enhancement Project
cbec was contracted to assist in the design and creation of habitat enhancement features on Dry Creek below Warm Springs Dam in Sonoma County.