Archives
Projects
Discipline Used: Hydrology
Big Creek Watershed GIS, Hydrologic/Water Quality Monitoring & Analysis
The Posey County Soil and Water Conservation District (SWCD) and Drainage Board contracted cbec to conduct a yearlong hydrologic and water quality monitoring study within the Big Creek Watershed in._.
Nur Pon Open Space Side Channel Salmon Habitat Project
This project, located downstream of the Shasta Dam and nestled in the north end of the Sacramento Valley, restored 4.8 acres of critical salmonid spawning and rearing habitat in Redding’s._.
Flights End Restoration Concept Modeling and Alternative Analysis
The Flights End site is within the ODFW managed Sauvie Island Wildlife Area, a floodplain refuge habitat just downstream of the urban waterfront corridors on the Columbia and Willamette Rivers.
Crane/Domeyer/Willow Bar Restoration Project
The Crane, Domeyer, and Willow Bar sites are all part of the Sauvie Island Wildlife Area (Oregon Department of Fish & Wildlife). They are managed for fish and wildlife habitat._.
Calero County Park Pond and Wetland Restoration and Monitoring Project
Funded by the Santa Clara Valley Habitat Agency, this project was planned, designed, and constructed to restore pond and wetland habitats at two locations in Calero County Park.
Bear River Levee Setback Project
Prior to joining cbec, select cbec staff members provided geomorphic and ecosystem enhancement services to the Three Rivers Levee Improvement Authority (TRLIA) on the Bear River Levee Setback Project.
Lower American River Salmonid Habitat Enhancement Program
This ongoing salmonid gravel augmentation and side-channel habitat establishment program effort is made possible by continued collaboration with the Water Forum, US Bureau of Reclamation, and the US Fish &._.
Butano Creek Channel Reconnection and Resilience Project
This multi-objective project addresses critical fish passage, water quality and flood risk challenges affecting Butano Creek, Pescadero Marsh and Lagoon and the surrounding community of Pescadero in unincorporated San Mateo._.
Kings Bay Flow Modeling and Sedimentation Study
cbec worked as a subcontractor to Versar, Inc, on behalf of AECOM and Naval Facilities Engineering Command (NAVFAC) – Atlantic. cbec built a hydrodynamic and sediment transport model of the._.
Wetland Design in the Patoka Valley
cbec prepared final designs for wetland creation and enhancement on two 40-acre parcels of land in Pike County owned by Patoka Valley Conservation Partners (PVCP). This project was ultimately enrolled._.
Metz Lateral Channel Rehabilitation
Located in Posey County, Indiana, the purpose of this project was to stabilize ongoing erosion problems in the lower 750 feet of the Metz Lateral Drain upstream from its confluence._.
Flood Impact Analysis for the Saluda Hydroelectric Project
The Federal Energy Regulatory Commission (FERC) requested Dominion Energy to quantify potential effects of a proposed change in reservoir operational procedures on flood levels upstream and downstream from the Saluda Hydroelectric._.
Wallace Weir Improvement and Fish Exclusion Project
Part of the California Natural Resources Agency’s California EcoRestore initiative, this fish exclusion project aimed to improve the operations of Wallace Weir, as well as implement a fish trapping facility._.
Natomas East Main Drainage Canal Monitoring Project
cbec has been undertaking a variety of different monitoring activities on Natomas East Main Drainage Canal (NEMDC), otherwise known as Steelhead Creek, since 2015. Monitoring activities include unmanned aerial system._.
Little Egbert Tract Feasibility Study and Multi-Benefit Project
Under contract with SAFCA, the study team (Wood Rogers, cbec, MBK, ICF, and David Sill) in collaboration with the steering committee (SAFCA, Larsen Wurzel & Associates, Westervelt Ecological Services, DWR._.