Discipline Used: Hydrology
Dry Creek Greenway Trail Fluvial Audit
cbec was contracted to assess the potential risk and prioritize mitigative measures for the City of Roseville muti-use trail along approximately 4.5 miles of Dry, Cirby and Linda Creeks between._.
Selby Slag EIR
On behalf of the California Department of Toxic Substances Control (DTSC), cbec worked as a subcontractor to Ascent Environmental, Inc., and teamed with AECOM and Stillwater Sciences to inform the._.
Bangor P990 Shine Tidelands State Park Tidal Lagoon Restoration Feasibility and Tidal Hydrodynamic Modeling
cbec performed detailed field data collection, and developed a 2-dimensional hydrodynamic model of tidal and nearshore processes at the Shine Tidelands State Park proposed restoration site.
Bangor P990 Big Quilcene River Floodplain and Delta Restoration Feasibility, Fluvial and Tidal Hydrodynamic Modeling
cbec performed detailed field data collection, and 2-dimensional hydrodynamic modeling of the complex fluvial and tidal deltaic reaches of the Big Quilcene River proposed restoration site, Jefferson County, Washington.
Bangor P990 Big Beef Estuary Restoration Feasibility, Tidal Hydrodynamic and Sediment Transport Modeling
cbec performed detailed field data collection, and 2-dimensional hydrodynamic and sediment transport modeling of estuarine processes at the Big Beef Creek and Estuary proposed restoration site.
Huckleberry Island Dam Modification
cbec was contracted to investigate the feasibility of modifying or removing the Huckleberry Island Dam to improve passage conditions. Huckleberry Island Dam is located on the San Lorenzo River in._.
Southport Multi-Objective Flood Control and Habitat Restoration Project
A cornerstone project for cbec, spanning multiple years, and with various project team configurations, this West Sacramento Area Flood Control Agency (WSAFCA) project’s goal is to set back parts of._.
Oroville Wildlife Area Flood Stage Reduction Project
Feather River bank composition Bank line analysis cbec was sub contracted by PBI to provide a geomorphic assessment of the Feather River in vicinity of the South Unit Oroville Wildlife._.
Swift Slough Restoration Feasibility Study
cbec conducted a feasibility study, on behalf of Florida Fish and Wildlife Conservation Commission, to investigate the dynamics of sediment transport / deposition in the main channel of the Apalachicola._.
Yolo Flyway Farms Tidal Restoration Project
Diagram of project area. Excavation of south berm breach. Excavation of north berm breach. The Yolo Flyway Farms Tidal Restoration Project is located at the southern end of the Yolo._.
Lower American River, Lake Natoma and Folsom Reservoir Hydrodynamic and Water Temperature Modeling Project
cbec has developed and applied a variety of hydrodynamic and water temperature models for the American River, Lake Natoma and Folsom Reservoir.
Black Butte Dam Erosion Repairs
The City of Santa Clara operates a hydroelectric power generating facility at Black Butte Reservoir near Orland, CA. When the facility was constructed, a re-regulation basin was created below the._.
Yolo County Drainage and Water Infrastructure Improvement Study
Wallace Weir is located at the terminus of the Knights Landing Ridge Cut and west levee of the Yolo Bypass. Yolo County funded the study of proposals to address potential._.
Honolulu Bar Fisheries Enhancement Project
Honolulu Bar is located on United States Army Corps of Engineers (USACE) property and funded by a grant from the U.S. Fish and Wildlife Service – Anadromous Fish Restoration Program.._.
Sewer Crossing Bank Stabilization and Toe Stabilization Design
As part of the Sacramento Area Sewer District’s Creek Protection Project, cbec teamed with Brown & Caldwell to conduct a geomorphic reconnaissance at 40 stream sewer crossings in Sacramento County.._.