Projects

Service Areas
Disciplines
Waterbody/Watershed

Southport Multi-Objective Flood Control and Habitat Restoration Project

A cornerstone project for cbec, spanning multiple years, and with various project team configurations, this West Sacramento Area Flood Control Agency (WSAFCA) project’s goal is to set back parts of._.

Read more

Hallwood Side Channel and Floodplain Restoration Project

This project is designed to restore and enhance ecosystem processes within an important reach of the Yuba River. The primary project focus is on enhancing productive juvenile salmonid rearing habitat._.

Read more

Butano Creek Floodplain Reconnection and Restoration Design and Monitoring

Engineered log jam in channel supports floodplain reconnection on left bank where berm was removed.Simulated floodplain inundation for a 2-year event for pre-project and post-project conditions.Unsteady 2-dimensional floold simulation of._.

Read more


Lower American River Salmonid Habitat Enhancement Program

This ongoing salmonid gravel augmentation and side-channel habitat establishment program effort is made possible by continued collaboration with the Water Forum, US Bureau of Reclamation, and the US Fish &._.

Read more

Butano Creek Channel Reconnection and Resilience Project

This multi-objective project addresses critical fish passage, water quality and flood risk challenges affecting Butano Creek, Pescadero Marsh and Lagoon and the surrounding community of Pescadero in unincorporated San Mateo._.

Read more

American River Parkway Cordova Creek Naturalization

cbec provided restoration/rehabilitation design services for Cordova Creek. Our approach to habitat restoration design and planning included three co-equal goals of the project: habitat quality, aesthetics, and functionality. Multiple stakeholders._.

Read more


Arcade Creek Park Preserve Restoration Project

Site 1 after biotechnical stabilization techniques application.Excavators installing rootwads into the banks of Arcade Creek to stabilize the bank and limit future erosion.Construction plans designed by cbec.Arcade Creek during a._.

Read more

Yolo Flyway Farms Tidal Restoration Project

Diagram of project area. Excavation of south berm breach. Excavation of north berm breach. The Yolo Flyway Farms Tidal Restoration Project is located at the southern end of the Yolo._.

Read more

Branciforte Creek Cahill Dam Removal Design and Monitoring

Before and after at previous site of Cahill Dam on Branciforte Creek. Schematic of the current condition, immediately post construction and future condition of the once dammed reach. cbec was._.

Read more


Lower Yolo Ranch Tidal Restoration Project

Lower Yolo Restoration project overview.Fish rescue operations prior to deepening existing canals.Newly created tidal channels connecting Yolo Ranch to Yolo Flyway Farms (during construction).Newly created tidal channels connected to deepened._.

Read more

Calero County Park Pond and Wetland Restoration and Monitoring Project

Funded by the Santa Clara Valley Habitat Agency, this project was planned, designed, and constructed to restore pond and wetland habitats at two locations in Calero County Park.

Read more

Bangor P990 Wharf Impacts Modeling

cbec performed detailed 2-dimensional hydrodynamic and sediment transport modeling of tidal flux and currents in the Hood Canal, a sub-basin within the Puget Sound inlet system, Washington.

Read more