Southport Multi-Objective Flood Control and Habitat Restoration Project
A cornerstone project for cbec, spanning multiple years, and with various project team configurations, this West Sacramento Area Flood Control Agency (WSAFCA) project’s goal is to set back parts of._.

Lower Yuba River Hallwood Channel and Floodplain Restoration Project
This project is designed to restore and enhance ecosystem processes within an important reach of the Yuba River. The primary project focus is on enhancing productive juvenile salmonid rearing habitat._.

Butano Creek Floodplain Reconnection and Restoration Design and Monitoring
Engineered log jam in channel supports floodplain reconnection on left bank where berm was removed. Simulated floodplain inundation for a 2-year event for pre-project and post-project conditions. cbec developed designs,._.

Lower American River Salmonid Gravel Augmentation and Side-Channel Habitat Establishment Program
This ongoing salmonid gravel augmentation and side-channel habitat establishment program effort is made possible by continued collaboration with the Water Forum, US Bureau of Reclamation, and the US Fish &._.

Butano Creek Channel Reconnection and Resilience Project
This multi-objective project addresses critical fish passage, water quality and flood risk challenges affecting Butano Creek, Pescadero Marsh and Lagoon and the surrounding community of Pescadero in unincorporated San Mateo._.

American River Parkway Cordova Creek Naturalization
cbec provided restoration/rehabilitation design services for Cordova Creek. Our approach to habitat restoration design and planning included three co-equal goals of the project: habitat quality, aesthetics, and functionality. Multiple stakeholders._.

Arcade Creek Park Preserve Restoration Project
Placement of biotechnical bank stabilization measures as part of the creek naturalization project Sample construction plans from project This award-winning project is located in Citrus Height’s Arcade Creek Park Preserve,._.

Yolo Flyway Farms Tidal Restoration Project
Diagram of project area. Excavation of south berm breach. Excavation of north berm breach. The Yolo Flyway Farms Tidal Restoration Project is located at the southern end of the Yolo._.

Branciforte Creek Cahill Dam Removal Design and Monitoring
Before and after at previous site of Cahill Dam on Branciforte Creek. Schematic of the current condition, immediately post construction and future condition of the once dammed reach. cbec was._.

Lower Yolo Restoration Project
Lower Yolo Restoration project overview.Fish rescue operations prior to deepening existing canals.Newly created tidal channels connecting Yolo Ranch to Yolo Flyway Farms (during construction).Newly created tidal channels connected to deepened._.

Calero County Park Pond and Wetland Restoration Project
Funded by the Santa Clara Valley Habitat Agency, this project was planned, designed, and constructed to restore pond and wetland habitats at two locations in Calero County Park.

Bangor P990 Wharf Impacts Modeling
cbec performed detailed 2-dimensional hydrodynamic and sediment transport modeling of tidal flux and currents in the Hood Canal, a sub-basin within the Puget Sound inlet system, Washington.
Eddleston Water Restoration at Cringletie, Lake Wood and Shiphorns
cbec was contracted by Dundee University and the Tweed Forum to provide the joint benefits of improving the ecological status (through river restoration) and natural flood management to local housing/._.

East Tullos Burn Restoration
cbec was contracted by Aberdeen City Council to restore the East Tullos Burn in Torry from a hard‐engineered straightened channel into a more natural stream and associated functional floodplain. An._.

River Derwent Feasibility Study
cbec has been contracted by Natural England to investigate opportunities available for restoration of the upper River Derwent and Stonethwaite Beck in Borrowdale, Cumbria. A desk-based literature review was._.

Allt Lorgy Restoration
cbec applied a full ‘process restoration’ strategy on a tributary of the River Dulnain, with the aim of reinstating dynamic geomorphic and ecological processes. We identified the dominant constraints to._.