Kings Bay Flow Modeling and Sedimentation Study
cbec worked as a subcontractor to Versar, Inc, on behalf of AECOM and Naval Facilities Engineering Command (NAVFAC) – Atlantic. cbec built a hydrodynamic and sediment transport model of the._.

Dry Creek Greenway Trail Fluvial Audit
cbec was contracted to assess the potential risk and prioritize mitigative measures for the City of Roseville muti-use trail along approximately 4.5 miles of Dry, Cirby and Linda Creeks between._.

Flood Impact Analysis for the Saluda Hydroelectric Project
The Federal Energy Regulatory Commission (FERC) requested Dominion Energy to quantify potential effects of a proposed change in reservoir operational procedures on flood levels upstream and downstream from the Saluda Hydroelectric._.

Wetland Design in the Patoka Valley
cbec prepared final designs for wetland creation and enhancement on two 40-acre parcels of land in Pike County owned by Patoka Valley Conservation Partners (PVCP). This project was ultimately enrolled._.

Yolo Bypass Wildlife Area Habitat and Drainage Improvements
The Yolo Bypass Wildlife Area (YBWA) supports agricultural and wildlife habitat management objectives as well as public use. Water delivery and drainage are vital to provide optimal conditions for all._.

Metz Lateral Channel Rehabilitation
Located in Posey County, Indiana, the purpose of this project was to stabilize ongoing erosion problems in the lower 750 feet of the Metz Lateral Drain upstream from its confluence._.

Selby Slag EIR
On behalf of the California Department of Toxic Substances Control (DTSC), cbec worked as a subcontractor to Ascent Environmental, Inc., and teamed with AECOM and Stillwater Sciences to inform the._.

Wallace Weir Improvement and Fish Exclusion Project
Part of the California Natural Resources Agency’s California EcoRestore initiative, this fish exclusion project aimed to improve the operations of Wallace Weir, as well as implement a fish trapping facility._.

Caltrans HSU Guidance Document
Trash and road debris clogging storm drains is a major problem within California’s municipalities. This phenomenon affects numerous systems that rely on the effective filtering of stormwater, as well as._.

Little Egbert Multi-Objective Project and Feasibility Study
Under contract with SAFCA, the study team (Wood Rogers, cbec, MBK, ICF, and David Sill) in collaboration with the steering committee (SAFCA, Larsen Wurzel & Associates, Westervelt Ecological Services, DWR._.

Dry Creek Watershed Project Prioritization
cbec identified, reviewed and prioritized stream enhancement and rehabilitation projects within the City’s portion of the Dry Creek watershed.

Laguna Creek Restoration Project
Vulcan Materials Company is actively mining aggregate at the Triangle Rock Products facility in Sacramento County adjacent to Laguna Creek and within the creeks active floodplain. To mitigate for impacts._.

Hallingdalselva Habitat Enhancement
In 2014, cbec was contracted by E-CO to undertake an options appraisal on a ~ 7 km reach of the River Hallingdalselva, nr. Gol, Norway.
River Naver Catchment Restoration
cbec led a team with the EnviroCentre and Mike Donaghy Associates to develop a prioritized catchment restoration plan on the River Naver, Sutherland. The primary objective of the project was,._.

Dowlais Culvert Assessment
cbec undertook work relating to the design of a culvert on the Nant Morlais stream in Dowlais, Merthyr Tydfil. An upgraded access track suitable for the transport of construction machinery._.

Wooler Bank Stabilization
cbec was contracted by the Tweed Forum to design measures to stabilize a section of eroding bank on the Wooler Water, Northumberland. The Wooler Water is a highly dynamic gravel-bed._.

River Wandle Restoration
cbec was contracted by The Wandle Trust in south London to restore a 1.5km of an urban chalkstream, involving the removal/ modification of three weir structures and associated channel reprofiling.._.

SEPA Pilot Catchment Project – Options Appraisal and Outline Design – River Nith (Castlemains, New Cumnock)
cbec have developed detailed restoration designs for a reach of the River Nith at Castlemains, New Cumnock. This reach was prioritised for restoration in the first phase of SEPA’s pilot._.

River Otter, Devon
cbec, in conjunction with APEM Ltd, conducted habitat modelling on three ~500m long sections on the River Otter, Devon to assess the impacts of changes to the flow regime. The._.
River Nar at Pentney
cbec, in conjunction with frog environmental, were contracted by the Norfolk Rivers Trust to design restoration measures for the tidally-influenced end of a chalk stream in north Norfolk.
Ellie Burn Restoration
cbec was contracted to develop restoration measures for the wetland around Ellie Burn, Aberdeenshire, with the ultimate aim of assisting in the improvement of the current ‘moderate’ ecological status (as._.