Kings Bay Flow Modeling and Sedimentation Study

cbec worked as a subcontractor to Versar, Inc, on behalf of AECOM and Naval Facilities Engineering Command (NAVFAC) – Atlantic. cbec built a hydrodynamic and sediment transport model of the._.

Read more

Nur Pon Open Space Side Channel Salmon Habitat Project

This project, located downstream of the Shasta Dam and nestled in the north end of the Sacramento Valley, restored 4.8 acres of critical salmonid spawning and rearing habitat in Redding’s._.

Read more

Wetland Design in the Patoka Valley

cbec prepared final designs for wetland creation and enhancement on two 40-acre parcels of land in Pike County owned by Patoka Valley Conservation Partners (PVCP). This project was ultimately enrolled._.

Read more


Dry Creek Greenway Trail Fluvial Audit

cbec was contracted to assess the potential risk and prioritize mitigative measures for the City of Roseville muti-use trail along approximately 4.5 miles of Dry, Cirby and Linda Creeks between._.

Read more

Flood Impact Analysis for the Saluda Hydroelectric Project

The Federal Energy Regulatory Commission (FERC) requested Dominion Energy to quantify potential effects of a proposed change in reservoir operational procedures on flood levels upstream and downstream from the Saluda Hydroelectric._.

Read more

Metz Lateral Channel Rehabilitation

Located in Posey County, Indiana, the purpose of this project was to stabilize ongoing erosion problems in the lower 750 feet of the Metz Lateral Drain upstream from its confluence._.

Read more


Yolo Bypass Wildlife Area Habitat and Drainage Improvements

The Yolo Bypass Wildlife Area (YBWA) supports agricultural and wildlife habitat management objectives as well as public use. Water delivery and drainage are vital to provide optimal conditions for all._.

Read more

Selby Slag EIR

On behalf of the California Department of Toxic Substances Control (DTSC), cbec worked as a subcontractor to Ascent Environmental, Inc., and teamed with AECOM and Stillwater Sciences to inform the._.

Read more

Wallace Weir Improvement and Fish Exclusion Project

Part of the California Natural Resources Agency’s California EcoRestore initiative, this fish exclusion project aimed to improve the operations of Wallace Weir, as well as implement a fish trapping facility._.

Read more


Little Egbert Tract Feasibility Study and Multi-Benefit Project

Under contract with SAFCA, the study team (Wood Rogers, cbec, MBK, ICF, and David Sill) in collaboration with the steering committee (SAFCA, Larsen Wurzel & Associates, Westervelt Ecological Services, DWR._.

Read more

Bangor P990 Shine Tidelands State Park Tidal Lagoon Restoration Feasibility and Tidal Hydrodynamic Modeling

cbec performed detailed field data collection, and developed a 2-dimensional hydrodynamic model of tidal and nearshore processes at the Shine Tidelands State Park proposed restoration site.

Read more

Yolo Bypass Salmonid Habitat Restoration and Fish Passage Project EIS/EIR

The Yolo Bypass Salmonid Habitat Restoration and Fish Passage Project is a collaboration between the Bureau of Reclamation and California Department of Water Resources, that aims to provide seasonal inundation._.

Read more