Projects

Service Areas
Disciplines
River/Watershed

Kings Bay Flow Modeling and Sedimentation Study

cbec worked as a subcontractor to Versar, Inc, on behalf of AECOM and Naval Facilities Engineering Command (NAVFAC) – Atlantic. cbec built a hydrodynamic and sediment transport model of the._.

Read more

Dry Creek Greenway Trail Fluvial Audit

cbec was contracted to assess the potential risk and prioritize mitigative measures for the City of Roseville muti-use trail along approximately 4.5 miles of Dry, Cirby and Linda Creeks between._.

Read more

Flood Impact Analysis for the Saluda Hydroelectric Project

The Federal Energy Regulatory Commission (FERC) requested Dominion Energy to quantify potential effects of a proposed change in reservoir operational procedures on flood levels upstream and downstream from the Saluda Hydroelectric._.

Read more


Wetland Design in the Patoka Valley

cbec prepared final designs for wetland creation and enhancement on two 40-acre parcels of land in Pike County owned by Patoka Valley Conservation Partners (PVCP). This project was ultimately enrolled._.

Read more

Yolo Bypass Wildlife Area Habitat and Drainage Improvements

The Yolo Bypass Wildlife Area (YBWA) supports agricultural and wildlife habitat management objectives as well as public use. Water delivery and drainage are vital to provide optimal conditions for all._.

Read more

Metz Lateral Channel Rehabilitation

Located in Posey County, Indiana, the purpose of this project was to stabilize ongoing erosion problems in the lower 750 feet of the Metz Lateral Drain upstream from its confluence._.

Read more


Selby Slag EIR

On behalf of the California Department of Toxic Substances Control (DTSC), cbec worked as a subcontractor to Ascent Environmental, Inc., and teamed with AECOM and Stillwater Sciences to inform the._.

Read more

Wallace Weir Improvement and Fish Exclusion Project

Part of the California Natural Resources Agency’s California EcoRestore initiative, this fish exclusion project aimed to improve the operations of Wallace Weir, as well as implement a fish trapping facility._.

Read more

Caltrans HSU Guidance Document

Trash and road debris clogging storm drains is a major problem within California’s municipalities. This phenomenon affects numerous systems that rely on the effective filtering of stormwater, as well as._.

Read more


Little Egbert Multi-Objective Project and Feasibility Study

Under contract with SAFCA, the study team (Wood Rogers, cbec, MBK, ICF, and David Sill) in collaboration with the steering committee (SAFCA, Larsen Wurzel & Associates, Westervelt Ecological Services, DWR._.

Read more

Dry Creek Watershed Project Prioritization

cbec identified, reviewed and prioritized  stream enhancement and rehabilitation projects within the City’s portion of the Dry Creek watershed.

Read more

Laguna Creek Restoration Project

Vulcan Materials Company is actively mining aggregate at the Triangle Rock Products facility in Sacramento County adjacent to Laguna Creek and within the creeks active floodplain. To mitigate for impacts._.

Read more


Service Areas
Disciplines
River/Watershed