Projects

Service Areas
Disciplines
River/Watershed

Bangor P990 Shine Tidelands State Park Tidal Lagoon Restoration Feasibility and Tidal Hydrodynamic Modeling

cbec performed detailed field data collection, and developed a 2-dimensional hydrodynamic model of tidal and nearshore processes at the Shine Tidelands State Park proposed restoration site.

Read more

Bangor P990 Big Quilcene River Floodplain and Delta Restoration Feasibility, Fluvial and Tidal Hydrodynamic Modeling

cbec performed detailed field data collection, and 2-dimensional hydrodynamic modeling of the complex fluvial and tidal deltaic reaches of the Big Quilcene River proposed restoration site, Jefferson County, Washington.

Read more

Yolo Bypass Salmonid Habitat Restoration and Fish Passage Project EIS/EIR

The Yolo Bypass Salmonid Habitat Restoration and Fish Passage Project is a collaboration between the Bureau of Reclamation and California Department of Water Resources, that aims to provide seasonal inundation._.

Read more


Natomas East Main Drainage Canal Monitoring Project

cbec has been undertaking a variety of different monitoring activities on Natomas East Main Drainage Canal (NEMDC), otherwise known as Steelhead Creek, since 2015. Monitoring activities include unmanned aerial system._.

Read more

Bangor P990 Big Beef Estuary Restoration Feasibility, Tidal Hydrodynamic and Sediment Transport Modeling

cbec performed detailed field data collection, and 2-dimensional hydrodynamic and sediment transport modeling of estuarine processes at the Big Beef Creek and Estuary proposed restoration site.

Read more

Develop Solutions to Enhance Habitat and Reduce Flooding Along Butano Creek

A cbec-Stillwater Sciences team was contracted to develop solutions to enhance in channel and off channel habitat while also reducing the frequent flooding of Pescadero Creek Road at Butano Creek.._.

Read more


Huckleberry Island Dam Modification

cbec was contracted to investigate the feasibility of modifying or removing the Huckleberry Island Dam to improve passage conditions. Huckleberry Island Dam is located on the San Lorenzo River in._.

Read more

Lower American River Current Condition DEM and 2D Model Development Project

cbec is developing a current conditions digital elevation model (DEM) and HEC-RAS two-dimensional (2D) hydrodynamic model of the lower American River for the Sacramento Water Forum and the Sacramento Area._.

Read more

San Joaquin River Tributaries Settlement Process Technical Support

Example height above river mapping for the Tuolumne River and identification of two potential floodplain restoration sites. cbec provided technical support to the San Joaquin Technical Group by conducting data._.

Read more


Bear River Levee Setback Project

Prior to joining cbec, select cbec staff members provided geomorphic and ecosystem enhancement services to the Three Rivers Levee Improvement Authority (TRLIA) on the Bear River Levee Setback Project.

Read more

Lower Yuba River Long Bar Restoration Project

cbec is working as part of a team on this floodplain restoration project aiming to create rearing habitat for salmonids on a roughly 50-acre riverside gravel mine property at Long._.

Read more

Crane/Domeyer/Willow Bar Restoration Project

The Crane, Domeyer, and Willow Bar sites are all part of the Sauvie Island Wildlife Area (Oregon Department of Fish & Wildlife). They are managed for fish and wildlife habitat._.

Read more


Service Areas
Disciplines
River/Watershed