Projects

Service Areas
Disciplines
Waterbody/Watershed

Yolo Bypass Salmonid Habitat Restoration and Fish Passage Project EIS/EIR

The Yolo Bypass Salmonid Habitat Restoration and Fish Passage Project is a collaboration between the Bureau of Reclamation and California Department of Water Resources, that aims to provide seasonal inundation._.

Read more

Bangor P990 Big Beef Estuary Restoration Feasibility, Tidal Hydrodynamic and Sediment Transport Modeling

cbec performed detailed field data collection, and 2-dimensional hydrodynamic and sediment transport modeling of estuarine processes at the Big Beef Creek and Estuary proposed restoration site.

Read more

Natomas East Main Drainage Canal Monitoring Project

cbec has been undertaking a variety of different monitoring activities on Natomas East Main Drainage Canal (NEMDC), otherwise known as Steelhead Creek, since 2015. Monitoring activities include unmanned aerial system._.

Read more


Huckleberry Island Dam Modification

cbec was contracted to investigate the feasibility of modifying or removing the Huckleberry Island Dam to improve passage conditions. Huckleberry Island Dam is located on the San Lorenzo River in._.

Read more

Lower American River Current Condition DEM and 2D Model Development Project

cbec is developing a current conditions digital elevation model (DEM) and HEC-RAS two-dimensional (2D) hydrodynamic model of the lower American River for the Sacramento Water Forum and the Sacramento Area._.

Read more

Big Creek Watershed GIS, Hydrologic/Water Quality Monitoring & Analysis

The Posey County Soil and Water Conservation District (SWCD) and Drainage Board contracted cbec to conduct a yearlong hydrologic and water quality monitoring study within the Big Creek Watershed in._.

Read more


Bear River Levee Setback Project

Prior to joining cbec, select cbec staff members provided geomorphic and ecosystem enhancement services to the Three Rivers Levee Improvement Authority (TRLIA) on the Bear River Levee Setback Project.

Read more

Lower Yuba River Long Bar Restoration Project

cbec is working as part of a team on this floodplain restoration project aiming to create rearing habitat for salmonids on a roughly 50-acre riverside gravel mine property at Long._.

Read more

Crane/Domeyer/Willow Bar Restoration Project

The Crane, Domeyer, and Willow Bar sites are all part of the Sauvie Island Wildlife Area (Oregon Department of Fish & Wildlife). They are managed for fish and wildlife habitat._.

Read more


Flights End Restoration Concept Modeling and Alternative Analysis

The Flights End site is within the ODFW managed Sauvie Island Wildlife Area, a floodplain refuge habitat just downstream of the urban waterfront corridors on the Columbia and Willamette Rivers.

Read more

Shire Fish Passage Enhancement Modeling

The Shire project site is located in the Columbia River Gorge in Washington State. The site offers an opportunity to enhance the tidal hydrological connection to a high quality forested._.

Read more

Oroville Wildlife Area Flood Stage Reduction Project

Feather River bank composition Bank line analysis cbec was sub contracted by PBI to provide a geomorphic assessment of the Feather River in vicinity of the South Unit Oroville Wildlife._.

Read more