Projects

Service Areas
Disciplines
Waterbody/Watershed

Shire Fish Passage Enhancement Modeling

The Shire project site is located in the Columbia River Gorge in Washington State. The site offers an opportunity to enhance the tidal hydrological connection to a high quality forested._.

Read more

San Joaquin River Tributaries Settlement Process Technical Support

Example height above river mapping for the Tuolumne River and identification of two potential floodplain restoration sites. cbec provided technical support to the San Joaquin Technical Group by conducting data._.

Read more

Bear River Levee Setback Project

Prior to joining cbec, select cbec staff members provided geomorphic and ecosystem enhancement services to the Three Rivers Levee Improvement Authority (TRLIA) on the Bear River Levee Setback Project.

Read more


Oroville Wildlife Area Flood Stage Reduction Project

Feather River bank composition Bank line analysis cbec was sub contracted by PBI to provide a geomorphic assessment of the Feather River in vicinity of the South Unit Oroville Wildlife._.

Read more

Swift Slough Restoration Feasibility Study

cbec conducted a feasibility study, on behalf of Florida Fish and Wildlife Conservation Commission, to investigate the dynamics of sediment transport / deposition in the main channel of the Apalachicola._.

Read more

Boulder Creek Stabilization Project

cbec eco engineering (cbec) developed design plans for stream bed repairs associated with Boulder Creek, downstream of the Lawson Portal, along the toe of the Boulder Creek Landslide. Channel incision._.

Read more


Lower American River, Lake Natoma and Folsom Reservoir Hydrodynamic and Water Temperature Modeling Project

cbec has developed and applied a variety of hydrodynamic and water temperature models for the American River, Lake Natoma and Folsom Reservoir.

Read more

Black Butte Dam Erosion Repairs

The City of Santa Clara operates a hydroelectric power generating facility at Black Butte Reservoir near Orland, CA. When the facility was constructed, a re-regulation basin was created below the._.

Read more

WSAFCA Flood Program Phase 1

cbec provided geomorphic assessment and planning services to support preparation of an updated flood program scope and budget for WSAFCA The updated scope and budget for the program were presented._.

Read more


Oak Ridge Drive Bridge Replacement Geomorphology Study

Linda Creek, a tributary to Dry Creek, runs through a greenway corridor within a densely urbanized watershed. This effort combined field reconnaissance with 2D modeling to investigate the effects of._.

Read more

Decker Island Habitat Restoration Project

cbec performed site‐scale hydrodynamic modeling to evaluate restoration design alternatives at Decker Island in support of the DWR Decker Island Habitat Restoration Project.

Read more

Yolo County Drainage and Water Infrastructure Improvement Study

Wallace Weir is located at the terminus of the Knights Landing Ridge Cut and west levee of the Yolo Bypass. Yolo County funded the study of proposals to address potential._.

Read more


Service Areas
Disciplines
Waterbody/Watershed