Projects

Service Areas
Disciplines
River/Watershed

Flights End Restoration Concept Modeling and Alternative Analysis

The Flights End site is within the ODFW managed Sauvie Island Wildlife Area, a floodplain refuge habitat just downstream of the urban waterfront corridors on the Columbia and Willamette Rivers.

Read more

Shire Fish Passage Enhancement Modeling

The Shire project site is located in the Columbia River Gorge in Washington State. The site offers an opportunity to enhance the tidal hydrological connection to a high quality forested._.

Read more

Oroville Wildlife Area Flood Stage Reduction Project

Feather River bank composition Bank line analysis cbec was sub contracted by PBI to provide a geomorphic assessment of the Feather River in vicinity of the South Unit Oroville Wildlife._.

Read more


Swift Slough Restoration Feasibility Study

cbec conducted a feasibility study, on behalf of Florida Fish and Wildlife Conservation Commission, to investigate the dynamics of sediment transport / deposition in the main channel of the Apalachicola._.

Read more

Boulder Creek Stabilization Project

cbec eco engineering (cbec) developed design plans for stream bed repairs associated with Boulder Creek, downstream of the Lawson Portal, along the toe of the Boulder Creek Landslide. Channel incision._.

Read more

Lower American River, Lake Natoma and Folsom Reservoir Hydrodynamic and Water Temperature Modeling Project

cbec has developed and applied a variety of hydrodynamic and water temperature models for the American River, Lake Natoma and Folsom Reservoir.

Read more


Black Butte Dam Erosion Repairs

The City of Santa Clara operates a hydroelectric power generating facility at Black Butte Reservoir near Orland, CA. When the facility was constructed, a re-regulation basin was created below the._.

Read more

WSAFCA Flood Program Phase 1

cbec provided geomorphic assessment and planning services to support preparation of an updated flood program scope and budget for WSAFCA The updated scope and budget for the program were presented._.

Read more

Oak Ridge Drive Bridge Replacement Geomorphology Study

Linda Creek, a tributary to Dry Creek, runs through a greenway corridor within a densely urbanized watershed. This effort combined field reconnaissance with 2D modeling to investigate the effects of._.

Read more


Decker Island Habitat Restoration Project

cbec performed site‐scale hydrodynamic modeling to evaluate restoration design alternatives at Decker Island in support of the DWR Decker Island Habitat Restoration Project.

Read more

Yolo County Drainage and Water Infrastructure Improvement Study

Wallace Weir is located at the terminus of the Knights Landing Ridge Cut and west levee of the Yolo Bypass. Yolo County funded the study of proposals to address potential._.

Read more

Bangor P990 Crescent Bay Tidal Inlet Monitoring

In 2010, the US Navy undertook a tidal wetland restoration project at Crescent Harbor, Whidbey Island, Puget Sound, Washington. An important element of the restoration project was to breach a._.

Read more


Service Areas
Disciplines
River/Watershed