Projects

Flights End Restoration Concept Modeling and Alternative Analysis
The Flights End site is within the ODFW managed Sauvie Island Wildlife Area, a floodplain refuge habitat just downstream of the urban waterfront corridors on the Columbia and Willamette Rivers.

Shire Fish Passage Enhancement Modeling
The Shire project site is located in the Columbia River Gorge in Washington State. The site offers an opportunity to enhance the tidal hydrological connection to a high quality forested._.

Oroville Wildlife Area Flood Stage Reduction Project
Feather River bank composition Bank line analysis cbec was sub contracted by PBI to provide a geomorphic assessment of the Feather River in vicinity of the South Unit Oroville Wildlife._.

Swift Slough Restoration Feasibility Study
cbec conducted a feasibility study, on behalf of Florida Fish and Wildlife Conservation Commission, to investigate the dynamics of sediment transport / deposition in the main channel of the Apalachicola._.

Boulder Creek Stabilization Project
cbec eco engineering (cbec) developed design plans for stream bed repairs associated with Boulder Creek, downstream of the Lawson Portal, along the toe of the Boulder Creek Landslide. Channel incision._.

Lower American River, Lake Natoma and Folsom Reservoir Hydrodynamic and Water Temperature Modeling Project
cbec has developed and applied a variety of hydrodynamic and water temperature models for the American River, Lake Natoma and Folsom Reservoir.

Black Butte Dam Erosion Repairs
The City of Santa Clara operates a hydroelectric power generating facility at Black Butte Reservoir near Orland, CA. When the facility was constructed, a re-regulation basin was created below the._.

WSAFCA Flood Program Phase 1
cbec provided geomorphic assessment and planning services to support preparation of an updated flood program scope and budget for WSAFCA The updated scope and budget for the program were presented._.

Oak Ridge Drive Bridge Replacement Geomorphology Study
Linda Creek, a tributary to Dry Creek, runs through a greenway corridor within a densely urbanized watershed. This effort combined field reconnaissance with 2D modeling to investigate the effects of._.

Decker Island Habitat Restoration Project
cbec performed site‐scale hydrodynamic modeling to evaluate restoration design alternatives at Decker Island in support of the DWR Decker Island Habitat Restoration Project.

Yolo County Drainage and Water Infrastructure Improvement Study
Wallace Weir is located at the terminus of the Knights Landing Ridge Cut and west levee of the Yolo Bypass. Yolo County funded the study of proposals to address potential._.

Bangor P990 Crescent Bay Tidal Inlet Monitoring
In 2010, the US Navy undertook a tidal wetland restoration project at Crescent Harbor, Whidbey Island, Puget Sound, Washington. An important element of the restoration project was to breach a._.

Hallingdalselva Habitat Enhancement
In 2014, cbec was contracted by E-CO to undertake an options appraisal on a ~ 7 km reach of the River Hallingdalselva, nr. Gol, Norway.
River Naver Catchment Restoration
cbec led a team with the EnviroCentre and Mike Donaghy Associates to develop a prioritized catchment restoration plan on the River Naver, Sutherland. The primary objective of the project was,._.

Dowlais Culvert Assessment
cbec undertook work relating to the design of a culvert on the Nant Morlais stream in Dowlais, Merthyr Tydfil. An upgraded access track suitable for the transport of construction machinery._.

Wooler Bank Stabilization
cbec was contracted by the Tweed Forum to design measures to stabilize a section of eroding bank on the Wooler Water, Northumberland. The Wooler Water is a highly dynamic gravel-bed._.

River Wandle Restoration
cbec was contracted by The Wandle Trust in south London to restore a 1.5km of an urban chalkstream, involving the removal/ modification of three weir structures and associated channel reprofiling.._.

SEPA Pilot Catchment Project – Options Appraisal and Outline Design – River Nith (Castlemains, New Cumnock)
cbec have developed detailed restoration designs for a reach of the River Nith at Castlemains, New Cumnock. This reach was prioritised for restoration in the first phase of SEPA’s pilot._.

River Otter, Devon
cbec, in conjunction with APEM Ltd, conducted habitat modelling on three ~500m long sections on the River Otter, Devon to assess the impacts of changes to the flow regime. The._.
River Nar at Pentney
cbec, in conjunction with frog environmental, were contracted by the Norfolk Rivers Trust to design restoration measures for the tidally-influenced end of a chalk stream in north Norfolk.
Ellie Burn Restoration
cbec was contracted to develop restoration measures for the wetland around Ellie Burn, Aberdeenshire, with the ultimate aim of assisting in the improvement of the current ‘moderate’ ecological status (as._.