Projects

Service Areas
Disciplines
Waterbody/Watershed

Bangor P990 Crescent Bay Tidal Inlet Monitoring

In 2010, the US Navy undertook a tidal wetland restoration project at Crescent Harbor, Whidbey Island, Puget Sound, Washington. An important element of the restoration project was to breach a._.

Read more

Cordova Hills Geomorphic and Hydromodification Assessment

Panoramic view over Cordova Hills. Incised creek channel. cbec assisted SBM Site Services, LLC and MacKay & Somps Civil Engineers with the stormwater drainage master planning for the Cordova Hills._.

Read more

Elverta Specific Plan Hydrodynamic Modeling

cbec was contracted as a subconsultant to Mackay & Somps to perform a hydromodification impacts assessment of the Elverta Specific Plan (SP) on the receiving waters within and downstream of._.

Read more


Sewer Crossing Bank Stabilization and Toe Stabilization Design

As part of the Sacramento Area Sewer District’s Creek Protection Project, cbec teamed with Brown & Caldwell to conduct a geomorphic reconnaissance at 40 stream sewer crossings in Sacramento County.._.

Read more

Honolulu Bar Fisheries Enhancement Project

Honolulu Bar is located on United States Army Corps of Engineers (USACE) property and funded by a grant from the U.S. Fish and Wildlife Service – Anadromous Fish Restoration Program.._.

Read more

Sun Creek Hydromodification Planning

The Sun Creek development is a 1,250 acre proposed development within the City limits of Rancho Cordova. Mackay & Somps is the civil engineering consultant responsible for the master plan._.

Read more


Water Quality Evaluation of Battle Bend and Other Major Apalachicola River Sloughs

cbec worked with Philip Williams and Associates on a project that aimed to characterize the hydraulic connectivity and water quality of large floodplain sloughs within the Apalachicola River System. This._.

Read more

Lower American River – Sunrise Side Channel Design and Post-Project Performance Monitoring

Aerial image of the Sunrise Side Channel (on right) taken in 2009, after construction. Velocity measurements taken at 1500 cfs, to evaluate compliance with design criteria This project included modification._.

Read more

Triangle Rock Weir Design

Upper Laguna Creek flowing through Triangle Rock Property Map of the Site and Proposed Alternatives cbec performed hydraulic analysis of Upper Laguna Creek to support the design of flood mitigation._.

Read more


Alder Creek Hydromodification Impacts Assessment

Project features Erosion Potential (EP) Compliance cbec, inc. was contracted by MacKay & Somps, at the suggestion of Sacramento County DWR, to assess hydromodification impacts of the planned Glenborough at._.

Read more

Northern Liberty Island Fisheries Enhancement Project Assessment

cbec applied and refined a 2D hydrodynamic model using MIKE 21FM. The MIKE 21FM model developed by cbec encompasses a complex network of tidal channels (both natural and man-made) within._.

Read more

Grady Ranch EIS/EIR Review

Photos depict large-scale bank erosion and stream degradation Photos depict large-scale bank erosion and stream degradation cbec is providing peer review as part of a revision of an EIS/R associated._.

Read more


Service Areas
Disciplines
Waterbody/Watershed