Projects

Service Areas
Disciplines
River/Watershed

Santa Ynez River Two-Dimensional Flow Model

Santa Ynez River Simulated velocity for a flow of 6,150 cfs Water surface elevation for a flow of 1,300 cfs cbec was contracted by NMFS to construct a two-dimensional hydrodynamic._.

Read more

Lower Squaw Creek Restoration Project

A straightened and over-sized reach of the stream channel, with the ski resort in the background Examples of existing grade control and bank hardening currently in place This project intends._.

Read more

Fluvial Geomorphic Assessment in Support of 100-Year Flood Risk Analysis of the Yuba Goldfields

cbec performed a geomorphic assessment of the lower Yuba River adjacent to the Yuba Goldfields on behalf of Three Rivers Levee Improvement Authority (TRLIA), a joint powers agency established to._.

Read more


Urrutia Pond and Bank Restoration Project

cbec was part of the team that prepared the Surface Mining and Reclamation Act (SMARA) plan for the Urrutia Pond and associated river bank in the Lower American River Parkway.._.

Read more

Cougar Wetlands Habitat Improvement Analysis

Simulated velocity magnitude and direction. The Cougar Wetlands are part of a larger broad-based effort to restore and safeguard the integrity of the Cosumnes River, the last undammed river flowing._.

Read more

College Lake Improvement and Watershed Management Project

Wildlife at College Lake College Lake inundation The focus of this project was to develop a multi-objective management plan for College Lake that enhances opportunities for flood reduction, agricultural water._.

Read more


Feasibility Assessment for Barrier Construction along Sagehen Creek

Lahontan cutthroat trout Sagehen Creek cbec has been contracted by the California Department of Fish & Wildlife to assess the feasibility for fish passage barrier construction at multiple sites along._.

Read more

Lower Putah Creek Restoration Project

The Lower Putah Creek Restoration Project would create a new Lower Putah Creek channel through the Yolo Bypass Wildlife Area (YBWA). This channel would connect to and enhance the existing._.

Read more

M&T Chico Ranch / Llano Seco Rancho Fish Screen Facility Long-Term Project – Evaluation of Rock Removal on the Sacramento River

Meander migration model results SRH 2D model output – Velocity and Magnitude for the 100-year event M&T/Llano Seco Pumping Plant and Fish Screen Facility (Facility) provides water to agricultural lands._.

Read more


Moosa Creek Mitigation Bank

Aerial map of watersheds and project areas Existing 100-year flow diagram cbec was recently contracted by Moosa Creek, LLC, who proposes to develop the Moosa Creek Mitigation and Conservation Bank._.

Read more

Elk Grove Dry Wells Storm Event Water Quality and Flow Monitoring

cbec worked with Willdan Engineering on this City of Elk Grove project to determine whether dry wells, in combination with other low impact development (LID), are a cost-effective way to._.

Read more

Dry Creek Habitat Enhancement Project

cbec was contracted to assist in the design and creation of habitat enhancement features on Dry Creek below Warm Springs Dam in Sonoma County.

Read more


Service Areas
Disciplines
River/Watershed