Archives
Projects
Solution Covered: Environmental Rehabilitation

Caltrans HSU Guidance Document
Trash and road debris clogging storm drains is a major problem within California’s municipalities. This phenomenon affects numerous systems that rely on the effective filtering of stormwater, as well as._.

Dry Creek Watershed Project Prioritization
cbec identified, reviewed and prioritized stream enhancement and rehabilitation projects within the City’s portion of the Dry Creek watershed.

Bangor P990 Shine Tidelands State Park Tidal Lagoon Restoration Feasibility and Tidal Hydrodynamic Modeling
cbec performed detailed field data collection, and developed a 2-dimensional hydrodynamic model of tidal and nearshore processes at the Shine Tidelands State Park proposed restoration site.

Bangor P990 Big Quilcene River Floodplain and Delta Restoration Feasibility, Fluvial and Tidal Hydrodynamic Modeling
cbec performed detailed field data collection, and 2-dimensional hydrodynamic modeling of the complex fluvial and tidal deltaic reaches of the Big Quilcene River proposed restoration site, Jefferson County, Washington.

Bangor P990 Big Beef Estuary Restoration Feasibility, Tidal Hydrodynamic and Sediment Transport Modeling
cbec performed detailed field data collection, and 2-dimensional hydrodynamic and sediment transport modeling of estuarine processes at the Big Beef Creek and Estuary proposed restoration site.

Huckleberry Island Dam Modification
cbec was contracted to investigate the feasibility of modifying or removing the Huckleberry Island Dam to improve passage conditions. Huckleberry Island Dam is located on the San Lorenzo River in._.

Lower American River Current Condition DEM and 2D Model Development Project
cbec is developing a current conditions digital elevation model (DEM) and HEC-RAS two-dimensional (2D) hydrodynamic model of the lower American River for the Sacramento Water Forum and the Sacramento Area._.

Hallingdalselva Habitat Enhancement
In 2014, cbec was contracted by E-CO to undertake an options appraisal on a ~ 7 km reach of the River Hallingdalselva, nr. Gol, Norway.
River Naver Catchment Restoration
cbec led a team with the EnviroCentre and Mike Donaghy Associates to develop a prioritized catchment restoration plan on the River Naver, Sutherland. The primary objective of the project was,._.

Wooler Bank Stabilization
cbec was contracted by the Tweed Forum to design measures to stabilize a section of eroding bank on the Wooler Water, Northumberland. The Wooler Water is a highly dynamic gravel-bed._.

River Wandle Restoration
cbec was contracted by The Wandle Trust in south London to restore a 1.5km of an urban chalkstream, involving the removal/ modification of three weir structures and associated channel reprofiling.._.

SEPA Pilot Catchment Project – Options Appraisal and Outline Design – River Nith (Castlemains, New Cumnock)
cbec have developed detailed restoration designs for a reach of the River Nith at Castlemains, New Cumnock. This reach was prioritised for restoration in the first phase of SEPA’s pilot._.

River Otter, Devon
cbec, in conjunction with APEM Ltd, conducted habitat modelling on three ~500m long sections on the River Otter, Devon to assess the impacts of changes to the flow regime. The._.
River Nar at Pentney
cbec, in conjunction with frog environmental, were contracted by the Norfolk Rivers Trust to design restoration measures for the tidally-influenced end of a chalk stream in north Norfolk.
Ellie Burn Restoration
cbec was contracted to develop restoration measures for the wetland around Ellie Burn, Aberdeenshire, with the ultimate aim of assisting in the improvement of the current ‘moderate’ ecological status (as._.