Archives
Projects
Solution Covered: Public Outreach, Facilitation and Stakeholder Involvement
Nur Pon Open Space Side Channel Salmon Habitat Project
This project, located downstream of the Shasta Dam and nestled in the north end of the Sacramento Valley, restored 4.8 acres of critical salmonid spawning and rearing habitat in Redding’s._.
Butano Creek Channel Reconnection and Resilience Project
This multi-objective project addresses critical fish passage, water quality and flood risk challenges affecting Butano Creek, Pescadero Marsh and Lagoon and the surrounding community of Pescadero in unincorporated San Mateo._.
Metz Lateral Channel Rehabilitation
Located in Posey County, Indiana, the purpose of this project was to stabilize ongoing erosion problems in the lower 750 feet of the Metz Lateral Drain upstream from its confluence._.
Little Egbert Tract Feasibility Study and Multi-Benefit Project
Under contract with SAFCA, the study team (Wood Rogers, cbec, MBK, ICF, and David Sill) in collaboration with the steering committee (SAFCA, Larsen Wurzel & Associates, Westervelt Ecological Services, DWR._.
Hallwood Side Channel and Floodplain Restoration Project
This project is designed to restore and enhance ecosystem processes within an important reach of the Yuba River. The primary project focus is on enhancing productive juvenile salmonid rearing habitat._.
Yolo County Drainage and Water Infrastructure Improvement Study
Wallace Weir is located at the terminus of the Knights Landing Ridge Cut and west levee of the Yolo Bypass. Yolo County funded the study of proposals to address potential._.
College Lake Improvement and Watershed Management Project
Wildlife at College Lake College Lake inundation The focus of this project was to develop a multi-objective management plan for College Lake that enhances opportunities for flood reduction, agricultural water._.
Santa Clara River Estuary Habitat Restoration and Enhancement Feasibility Study
This project aims to explore the feasibility of expanding and enhancing estuarine habitat for steelhead and other native and protected species within the McGrath State Beach Campground. The Santa Clara._.
Low Impact Development Guidebook Preparation, Placer County
Placer County LID Guidebook Fact Sheet cbec partnered on a team led by Placer County to develop a Low Impact Development (LID) guidebook for Placer County. The project was funded._.
Donner Basin Watershed Assessment
Erosion Hazard Analysis Floodplain and channel restoration concept graphic for creek confluence cbec, joined by a consulting archaeologist and ecologists, conducted a watershed assessment of the Donner Basin, a 29.5._.
Butano Creek Floodplain Reconnection and Restoration Design and Monitoring
Engineered log jam in channel supports floodplain reconnection on left bank where berm was removed.Simulated floodplain inundation for a 2-year event for pre-project and post-project conditions.Unsteady 2-dimensional floold simulation of._.