Archives
Projects
Solution Covered: Remote Controlled Surveying and Monitoring
Big Creek Watershed GIS, Hydrologic/Water Quality Monitoring & Analysis
The Posey County Soil and Water Conservation District (SWCD) and Drainage Board contracted cbec to conduct a yearlong hydrologic and water quality monitoring study within the Big Creek Watershed in._.
Nur Pon Open Space Side Channel Salmon Habitat Project
This project, located downstream of the Shasta Dam and nestled in the north end of the Sacramento Valley, restored 4.8 acres of critical salmonid spawning and rearing habitat in Redding’s._.
Lower American River Salmonid Habitat Enhancement Program
This ongoing salmonid gravel augmentation and side-channel habitat establishment program effort is made possible by continued collaboration with the Water Forum, US Bureau of Reclamation, and the US Fish &._.
Butano Creek Channel Reconnection and Resilience Project
This multi-objective project addresses critical fish passage, water quality and flood risk challenges affecting Butano Creek, Pescadero Marsh and Lagoon and the surrounding community of Pescadero in unincorporated San Mateo._.
Wallace Weir Improvement and Fish Exclusion Project
Part of the California Natural Resources Agency’s California EcoRestore initiative, this fish exclusion project aimed to improve the operations of Wallace Weir, as well as implement a fish trapping facility._.
Natomas East Main Drainage Canal Monitoring Project
cbec has been undertaking a variety of different monitoring activities on Natomas East Main Drainage Canal (NEMDC), otherwise known as Steelhead Creek, since 2015. Monitoring activities include unmanned aerial system._.
Little Egbert Tract Feasibility Study and Multi-Benefit Project
Under contract with SAFCA, the study team (Wood Rogers, cbec, MBK, ICF, and David Sill) in collaboration with the steering committee (SAFCA, Larsen Wurzel & Associates, Westervelt Ecological Services, DWR._.
Lower American River Current Condition DEM and 2D Model Development Project
cbec is developing a current conditions digital elevation model (DEM) and HEC-RAS two-dimensional (2D) hydrodynamic model of the lower American River for the Sacramento Water Forum and the Sacramento Area._.
Southport Multi-Objective Flood Control and Habitat Restoration Project
A cornerstone project for cbec, spanning multiple years, and with various project team configurations, this West Sacramento Area Flood Control Agency (WSAFCA) project’s goal is to set back parts of._.
Lower American River, Lake Natoma and Folsom Reservoir Hydrodynamic and Water Temperature Modeling Project
cbec has developed and applied a variety of hydrodynamic and water temperature models for the American River, Lake Natoma and Folsom Reservoir.
Hallwood Side Channel and Floodplain Restoration Project
This project is designed to restore and enhance ecosystem processes within an important reach of the Yuba River. The primary project focus is on enhancing productive juvenile salmonid rearing habitat._.
Lower Yolo Ranch Tidal Restoration Project
Lower Yolo Restoration project overview.Fish rescue operations prior to deepening existing canals.Newly created tidal channels connecting Yolo Ranch to Yolo Flyway Farms (during construction).Newly created tidal channels connected to deepened._.
College Lake Improvement and Watershed Management Project
Wildlife at College Lake College Lake inundation The focus of this project was to develop a multi-objective management plan for College Lake that enhances opportunities for flood reduction, agricultural water._.
American River Parkway Cordova Creek Naturalization
cbec provided restoration/rehabilitation design services for Cordova Creek. Our approach to habitat restoration design and planning included three co-equal goals of the project: habitat quality, aesthetics, and functionality. Multiple stakeholders._.
Dry Creek Habitat Enhancement Project
cbec was contracted to assist in the design and creation of habitat enhancement features on Dry Creek below Warm Springs Dam in Sonoma County.
- 1
- 2