Archives
Projects
Solution Covered: Slowing the Flow

Oroville Wildlife Area Flood Stage Reduction Project
Feather River bank composition Bank line analysis cbec was sub contracted by PBI to provide a geomorphic assessment of the Feather River in vicinity of the South Unit Oroville Wildlife._.

Grady Ranch EIS/EIR Review
Photos depict large-scale bank erosion and stream degradation Photos depict large-scale bank erosion and stream degradation cbec is providing peer review as part of a revision of an EIS/R associated._.

Low Impact Development Guidebook Preparation, Placer County
Placer County LID Guidebook Fact Sheet cbec partnered on a team led by Placer County to develop a Low Impact Development (LID) guidebook for Placer County. The project was funded._.

Butano Creek Floodplain Reconnection and Restoration Design and Monitoring
Engineered log jam in channel supports floodplain reconnection on left bank where berm was removed.Simulated floodplain inundation for a 2-year event for pre-project and post-project conditions.Unsteady 2-dimensional floold simulation of._.