Solution Covered: Watershed Assessments
Big Creek Watershed GIS, Hydrologic/Water Quality Monitoring & Analysis
The Posey County Soil and Water Conservation District (SWCD) and Drainage Board contracted cbec to conduct a yearlong hydrologic and water quality monitoring study within the Big Creek Watershed in._.
Wetland Design in the Patoka Valley
cbec prepared final designs for wetland creation and enhancement on two 40-acre parcels of land in Pike County owned by Patoka Valley Conservation Partners (PVCP). This project was ultimately enrolled._.
Flood Impact Analysis for the Saluda Hydroelectric Project
The Federal Energy Regulatory Commission (FERC) requested Dominion Energy to quantify potential effects of a proposed change in reservoir operational procedures on flood levels upstream and downstream from the Saluda Hydroelectric._.
Dry Creek Greenway Trail Fluvial Audit
cbec was contracted to assess the potential risk and prioritize mitigative measures for the City of Roseville muti-use trail along approximately 4.5 miles of Dry, Cirby and Linda Creeks between._.
Southport Multi-Objective Flood Control and Habitat Restoration Project
A cornerstone project for cbec, spanning multiple years, and with various project team configurations, this West Sacramento Area Flood Control Agency (WSAFCA) project’s goal is to set back parts of._.
Oroville Wildlife Area Flood Stage Reduction Project
Feather River bank composition Bank line analysis cbec was sub contracted by PBI to provide a geomorphic assessment of the Feather River in vicinity of the South Unit Oroville Wildlife._.
Swift Slough Restoration Feasibility Study
cbec conducted a feasibility study, on behalf of Florida Fish and Wildlife Conservation Commission, to investigate the dynamics of sediment transport / deposition in the main channel of the Apalachicola._.
Yolo Flyway Farms Tidal Restoration Project
Diagram of project area. Excavation of south berm breach. Excavation of north berm breach. The Yolo Flyway Farms Tidal Restoration Project is located at the southern end of the Yolo._.
Lower American River, Lake Natoma and Folsom Reservoir Hydrodynamic and Water Temperature Modeling Project
cbec has developed and applied a variety of hydrodynamic and water temperature models for the American River, Lake Natoma and Folsom Reservoir.
McKay’s Point Reservoir Sedimentation Rate Study
Bathymetric Surface Comparison (2000 to 2011) Bathymetric Data Collection Using RTK cbec was contracted by NCPA to perform a Sedimentation Rate Study at McKay’s Point Reservoir. cbec performed a bathymetric._.
Santa Ynez River Two-Dimensional Flow Model
Santa Ynez River Simulated velocity for a flow of 6,150 cfs Water surface elevation for a flow of 1,300 cfs cbec was contracted by NMFS to construct a two-dimensional hydrodynamic._.
Raccoon Creek Watershed Assessment
Survey reach characterized by fluvial auditSpecific Stream Power analysis from the geomorphic assessment.Rendering of a conceptual design for a fish ladder and fish screen associated with a fish passage barrier._.
Donner Basin Watershed Assessment
Erosion Hazard Analysis Floodplain and channel restoration concept graphic for creek confluence cbec, joined by a consulting archaeologist and ecologists, conducted a watershed assessment of the Donner Basin, a 29.5._.