Archives
Projects
Solution Covered: Watershed Assessments

Wetland Design in the Patoka Valley
cbec prepared final designs for wetland creation and enhancement on two 40-acre parcels of land in Pike County owned by Patoka Valley Conservation Partners (PVCP). This project was ultimately enrolled._.

Flood Impact Analysis for the Saluda Hydroelectric Project
The Federal Energy Regulatory Commission (FERC) requested Dominion Energy to quantify potential effects of a proposed change in reservoir operational procedures on flood levels upstream and downstream from the Saluda Hydroelectric._.

Develop Solutions to Enhance Habitat and Reduce Flooding Along Butano Creek
A cbec-Stillwater Sciences team was contracted to develop solutions to enhance in channel and off channel habitat while also reducing the frequent flooding of Pescadero Creek Road at Butano Creek.._.

Dry Creek Greenway Trail Fluvial Audit
cbec was contracted to assess the potential risk and prioritize mitigative measures for the City of Roseville muti-use trail along approximately 4.5 miles of Dry, Cirby and Linda Creeks between._.

Dry Creek Watershed Project Prioritization
cbec identified, reviewed and prioritized stream enhancement and rehabilitation projects within the City’s portion of the Dry Creek watershed.

Hallingdalselva Habitat Enhancement
In 2014, cbec was contracted by E-CO to undertake an options appraisal on a ~ 7 km reach of the River Hallingdalselva, nr. Gol, Norway.
River Naver Catchment Restoration
cbec led a team with the EnviroCentre and Mike Donaghy Associates to develop a prioritized catchment restoration plan on the River Naver, Sutherland. The primary objective of the project was,._.

River Otter, Devon
cbec, in conjunction with APEM Ltd, conducted habitat modelling on three ~500m long sections on the River Otter, Devon to assess the impacts of changes to the flow regime. The._.
Eddleston Water Restoration at Cringletie, Lake Wood and Shiphorns
cbec was contracted by Dundee University and the Tweed Forum to provide the joint benefits of improving the ecological status (through river restoration) and natural flood management to local housing/._.

River Derwent Feasibility Study
cbec has been contracted by Natural England to investigate opportunities available for restoration of the upper River Derwent and Stonethwaite Beck in Borrowdale, Cumbria. A desk-based literature review was._.

Allt Lorgy Restoration
cbec applied a full ‘process restoration’ strategy on a tributary of the River Dulnain, with the aim of reinstating dynamic geomorphic and ecological processes. We identified the dominant constraints to._.

Southport Multi-Objective Flood Control and Habitat Restoration Project
A cornerstone project for cbec, spanning multiple years, and with various project team configurations, this West Sacramento Area Flood Control Agency (WSAFCA) project’s goal is to set back parts of._.

Oroville Wildlife Area Flood Stage Reduction Project
Feather River bank composition Bank line analysis cbec was sub contracted by PBI to provide a geomorphic assessment of the Feather River in vicinity of the South Unit Oroville Wildlife._.

Swift Slough Restoration Feasibility Study
cbec conducted a feasibility study, on behalf of Florida Fish and Wildlife Conservation Commission, to investigate the dynamics of sediment transport / deposition in the main channel of the Apalachicola._.

Yolo Flyway Farms Tidal Restoration Project
Diagram of project area. Excavation of south berm breach. Excavation of north berm breach. The Yolo Flyway Farms Tidal Restoration Project is located at the southern end of the Yolo._.
- 1
- 2